![]() ![]() This requires administrative rights over the machine, and you’ll be prompted to enter your credentials prior to loading IceFloor ( Figure D).įigure D You’ll need admin rights to load IceFloor. On first launch, a welcome screen will greet you. While it serves as an overview of IceFloor, the main thing to look for is the menu bar installer. ![]() This will install an IceFloor Menulet on the menu bar ( Figure E), where you can modify settings quickly. The IceFloor app itself is relatively easy to navigate. The Configuration Wizard provides a wizard to walk you through the initial configuration of IceFloor simply by answering questions.īeginning with the Help tab, there are four buttons to choose from: It uses a tabbed system, where each tab represents a particular section.The IceFloor User Guide provides a wealth of documentation, covering various the features and functions that may be configured.The OpenBSD 4.3 PF Manual is in PDF format, just like the IF User Guide, but it covers everything from beginning to advanced configurations of the personal firewall itself found in UNIX and OS X. ![]() The Uninstall IceFloor button will completely remove all traces of IceFloor from your Mac.Īdditionally, a contact link and donation button are present in the event that you run into trouble, wish to reach out to the developer, or would like to donate for the continued development of future versions of IceFloor ( Figure F).Ĭlick on the Firewall tab to bring up the configuration screen ( Figure G).Depending on your specific needs, the Lists drop-down will allow you to configure inbound/outbound connections (whitelist), block any form of connections being made to or from servers (blacklist), or even restrict bandwidth settings for both downloads and uploads. ![]() One of the greatest features of IceFloor is the ability to group together settings. The rink floor concrete was tested for flatness and levelness and awarded the Golden Trowel Award by the American Concrete Institute as the flattest concrete floor of its type for 2016.If you’ve ever configured firewall settings or performed user management in Open Directory, you’re aware that the process of manually entering data can be cumbersome when many entries are needed. Replacement of the dasher plastic, puck control netting and perimeter rubber flooring made the twenty year old dasher system and the surrounding area look new. Infill of the existing perimeter slab changed the once Olympic size rink to a NHL standard 85’x200’ ice sheet and provided room for expanded player boxes and future locker rooms. A completed sub floor heat system, 4” of rigid insulation with vapor barrier, rebar and the cold floor piping capped with a 5” concrete slab completed the floor system. Once the drainage system was completed, a barrier fabric was used to cap the drainage system stone prior to installation of the warm floor bedding material. The wet soft subgrade was removed from the rink floor area and a subfloor drainage system was installed to manage the ground water and remove it from the building. The frozen subgrade was thawed using a ground heating process until the 200’x75’x 2 ½’ ice berg was soft enough to excavate. All of the cold floor piping, insulation, warm floor piping, header piping and civil material was removed from the rink floor. The project consisted of removal of the dasher system, the existing ice sheet and the sand base rink floor. Rodgers Incorporated acted as the general contractor and self performed large portions of the work for The Chiller, LLC in an open book construction delivery method for this floor removal and replacement project. Construction mistakes and ground water issues over time lead to the deterioration of the subfloor heat system header and ultimately created an enormous permafrost problem. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |